Followers

Tuesday, February 19, 2008

Sky turns black as thousands of starlings flock into Gretna Green

Time was when the only visitors flocking to Gretna Green were eloping English couples.

Now the Scottish border village is getting arrivals by the million - and most of them come by air.

Swooping and swirling across the dimly lit sky, they could almost be mistaken for an approaching storm cloud.

In this dazzling aerial display, over a million starlings wheel and dive across the setting sun, creating elaborate patterns and drawing the admiring gaze of fascinated onlookers.

Scroll down for more...

Black sky: Thousands of starlings fly over a house

Every evening at dusk they take to the skies above Gretna Green, after a long day spent feeding in reed beds.

So begins the perilous search for somewhere safe to roost for the night, sheltered from the blustery February winds.

It is a a path fraught with danger, as hungry predators hover nearby.

The little birds must converge, flocking together and squawking, in an attempt to confuse the sparrowhawks, buzzards and peregrine falcons. Reaching speeds of over 20mph, it's a wonder that there aren't more feathers flying in mid-air collisions.

But scientists have recently discovered the secret behind their amazing spatial awareness. Each starling tracks seven other birds - irrespective of distance - enabling the group's impressive cohesion.

It is a spectacle that occurs only during the winter.

Scroll down for more...

Amazed: Birdwatchers gaze at the sky

Caught on camera: The starlings blacken the sky

Dr Andre Farrar, spokesman for the Royal Society for the Protection of Birds, thinks the sight should not be missed.

"It is one of the world's greatest wildlife experiences and anyone can enjoy it," he said.

"You just need to open your eyes and look up."

But don't leave it too long. As spring approaches, the same urge overtakes them as those runaway couples of old.

They pair off and look for suitable nesting grounds. They will not regroup until September, when their amazing daily display will begin again.

Original here

Eight Tips on How to Manage Feature Creep

Feature creep, also known as scope or requirement creep, refers to unforeseen requests for additions and changes that are outside the project scope. It typically happens due to inadequate requirements gathering, poor initial planning, and an unclear protocol for change implementation, among other things.

In this article, I’d like to discuss eight tips and suggestions, based mostly on my experience, to help minimize and manage the effects of feature creep in your own projects.

1. Accept that feature creep will happen.

That’s right. Here you are thinking that this article’s all about preventing feature creep. On the contrary, I feel that it’s a natural part of any project-based work. Acknowledging this eventuality will allow you to be prepared when it finally rears it’s ugly code-retrofitting, design-wrecking head. Anticipating unforeseen changes in your plans forces you to be more adaptable, and promotes the development of a solution that’s flexible and malleable to your client’s ever-changing needs.

2. Commit enough time to requirements-gathering.

Easy enough, fairly common sense, but we’re all guilty of rushing the planning phase of projects. Maybe it’s because of time and budgetary constraints, or our eagerness to show our clients tangible results, or the assurance we get that the project’s in the bag once we start it (and won’t be given to competition). Skimping on this step can lead to agony at the end, and can take the form of unanticipated feature requirements because of our failure to establish the client’s actual needs. Take time to survey the people involved, observe and shadow employees to see how they might use the system you’re developing, and get an accurate estimation of the technical expertise the organization has. An ounce of prevention is worth a few thousand lines of code revision.

3. Giving a hand might cost you your arm.

If you constantly give in to changes, you might be get more of them in the future. Try to set boundaries of what is and isn’t appropriate to revise, this not only prevents unneeded requests for changes, but gives the project strict quality-control guidelines. When you do decide to comply to un-scoped demands, make sure that you indicate that you’re doing something out-of-scope, and that this can cause delays and additional financial requirements. This may make them re-consider the value of the feature requested, or at least give you an extension in time and budget.

4. Be the devil’s advocate when changes are requested.

You were hired and assigned to the project because of your knowledge and expertise in the solution required. If a client asks for a Flash-based navigation menu, it is your expert obligation to convince them that the CSS-based menu you developed is a much better solution. Don’t be afraid to contradict unwise feature requests; providing well-formed reasons will assure them that you know your “shizznit”, and they may actually allow you to proceed as originally planned.

5. Be task-oriented, not vision-oriented.

Be clear on what it is, exactly, you’re developing for them. Don’t promise a grand, exciting, but ambiguous/ambitious end result. Instead of giving broad generalizations such as “I’ll be developing a search engine optimized website”, try to outline the deliverables that you will provide, such as: “I’ll be using image replacement techniques for sub-headings, creating and implementing a Sitemap.xml, submitting the site to major search engines, and optimizing page titles with relevant keywords”. This makes the project less ambiguous and prevents additional tasks, such as developing a link-exchange program to increase page rank results, which is clearly not part of your duties.

6. Shed the “Customer is Always Right” mentality.

You, more often than not, are a more qualified judge of how things should be developed. You’re not working to get a big tip at the end. You’re working (most probably) on a flat rate fee or an agreed-upon compensation. All you have to worry about is your reputation and producing an excellent solution. The employer can hate everything about you, but if you’ve provided an amazing profit-generating product, you’ll get hired back to do more. In the end, it’s more about profits and deliverables and less about how your employer loves your “reasonable personality” (because they love nothing more than making a bundle of cash or reducing their overhead due to the solution you developed). So don’t give in to unwarranted requests and unreasonable timelines simply because you want to be on your employer’s good side. Don’t feel pressured to do something that isn’t in the job description or something you feel will lead to a less desirable end product.

7. Research before committing.

Assuage the temptation to immediately accommodate a change in project scope, no matter how seemingly simple. If you think the budget and timeline can handle a modification in plans, research thoroughly on what the change actually entails before committing. For example, in a CMS development project I was involved in, I was asked if it was possible to migrate the system from our servers, to the client’s. This wasn’t part of the project scope, as the original plan was to also provide hosting for the system. I agreed to it thinking that a database export/import and file migration would take an hour’s work at most. I failed to account for the fact that our server set-up (being IIS 6.0/Windows and the client’s being Apache/Linux) and server settings were different. Suffice it to say that it took longer than anticipated and the task is still unfinished.

8. Realize that feature creep is a two-way street.

Clients and employers aren’t (purely) evil. They don’t intend to make our jobs more difficult. Oftentimes it’s our desire to please, to prove our worth, and our perfectionist mentality that can be, in part if not equally, to blame. If feature creep happens, it’s only because we allow it to.

I hope this article was able to impart some tips on how to manage feature creep. The suggestions here are based on my own mistakes with regards to allowing scope creep to affect my projects. I hope that by reading this, you have better luck in alleviating the impact that features out-of-scope can have on your timelines and budgets.

I’d like to ask: should feature creep be accepted as part of any project, or should it be prevented flat out? Are these tips ideal but unrealistic, and in what sense? Share your thoughts!

Original here

Punk Rock Your Life: The Simple Six-Letter Word That Determines Success


It’s June of 1976 in Manchester, England, and a small group of people gather in a tiny venue called the Lesser Free Trade Hall to see a band play. There’s nothing really remarkable about this group of 42 people, and that evening’s featured musicians are unknown at the time.

The band calls themselves the Sex Pistols.

As I mentioned, there were no famous people in the crowd at this show, or at the follow-up show that happened about a month later. The Sex Pistols had not yet caused an uproar throughout Britain with songs like Anarchy in the UK and God Save the Queen, and it was well before they invaded the US in 1978.

Attendees ranged from the local mailman to a few rebellious school children. But a handful of others in that small audience became some of the most influential people in independent and now mainstream music.

In that tiny crowd were the likes of Tony Wilson, who went on to start the influential Factory Records (home to New Order and Happy Mondays) and The Haçienda nightclub (the birthplace of rave culture), legendary producer Martin Hannett, and Paul Morley who became a music journalist for NME.

Also in attendance were the members of future punk favorites the Buzzcocks, Mark E. Smith of The Fall, Mick Hucknall who became lead singer of Simply Red, Morrissey who would later front The Smiths, and the founding members of Joy Division, who after the death of their lead singer would carry on as New Order.

If you’re not familiar with alternative music from the 1980s, let me put this in perspective. This tiny concert is considered on par with Woodstock and Live Aid in terms of importance, due to the influence the audience went on to have on popular music by creating the independent music scene.

Contrary to what you might think, not everyone in the audience thought the Sex Pistols were fantastic. Sure, some were attracted to the fresh, raw power of punk and the “do it yourself” ethos that came with it, but others thought the Pistols sounded like rubbish and thought they could do better.

Regardless, that small group of people spotted the changing dynamics in music and took action, because if the Pistols could do it, so could they. By seeing the inevitable future they became important players in that future.

Why did I just tell you a story about punk rock and independent music? Well, lots of people can spot trends and have great ideas, but only some do anything about it.

So, what’s the six-letter word that determines success in life?

Action.

What are you getting done today?

Brian Clark is the founder and editor of Copyblogger and the co-founder of Teaching Sells.

Original here